Bathroom refit

On 19/07/2013 by Mark Bulgin

Bathroom refit with whirlpool bath, shower cubicle with mermaid panels, vanity basin and back to wall toilet.

20130816-125630.jpg

20130816-125641.jpg

20130816-125657.jpg

The room all stripped out including removal of the old airing cupboard to give space for the shower cubicle.

20130816-125706.jpg

20130816-125717.jpg

20130816-125745.jpg

The new shower plumbed in and ready for the mermaid panels.

20130816-125753.jpg

The new vanity unit and concealed systern with back to wall toilet.

20130816-125801.jpg

The completed shower cubicle.

20130816-125819.jpg

White tiles in a brick bond pattern with a border of 2 high black mosaic tiles lines up with the bottom of the window.

20130816-125828.jpg

20130816-125835.jpg

20130816-125848.jpg

New chrome towel radiator in place of old radiator.

20130816-125858.jpg

20130816-125907.jpg

Black granite floor tiles with black grout also laid in a brick bond pattern.

20130816-125915.jpg

The completed bathroom.

20130826-074445.jpg

20130826-074500.jpg

20130826-074519.jpg

Leave a Reply

Your email address will not be published. Required fields are marked *

Time limit is exhausted. Please reload CAPTCHA.